Signage for Construction & Development Projects

Job-site identification, safety and regulatory signage, and project branding for contractors and developers.

Signage for construction and development

On a construction project, signage is a small line item that causes disproportionate trouble when it’s late. Temporary site signage has to be up before work starts. Permanent signage has to be permitted months before it’s installed, and installed in a narrow window between substantial completion and occupancy — usually while six other trades want the same access.

We work with general contractors, developers, and owner’s representatives across Denver Metro to keep signage tracking against the programme rather than becoming a punch-list item.

What we handle on a project

  • Development entrance signage — monument and property entrance signs at the drive, engineered and permitted with the foundation coordinated into the site works rather than cut in afterwards.
  • Construction-site signs — project identification boards naming the developer, GC, and trades, plus safety and regulatory signage specified to code.
  • Leasing and pre-sale signage — banners, yard signs, and hoarding or fence-scrim graphics that screen the site and market the project during construction.
  • Building identification — permanent building signs and channel lettering, with structural backing coordinated before the façade closes.
  • Tenant signage standards — writing or implementing the tenant sign criteria that will govern every tenant sign on the property for the life of the building.
  • Permit coordination — sign permits run separately from the building permit and on their own timeline. We track them as their own critical path.
  • Phased installation — temporary through to permanent, sequenced so each phase is in place when it’s needed and removed when it isn’t.
  • Coordination with architects and general contractors — working from your drawings, in your submittal and RFI process, to your schedule.
  • Closeout documentation — sign schedules, permits, warranties, and as-installed records handed over with the rest of the O&M package.

What we need from you, and when

The two things that most often delay signage on a project:

  1. Structural backing and electrical rough-in. Building signs need blocking behind the façade and power at the location. Both have to be decided before those assemblies close. Give us the elevation early and we’ll give you the backing and circuit requirements while it’s still cheap to accommodate.
  2. Permit lead time. Sign permits are a separate application, often with their own review and frequently needing stamped engineering for freestanding and large wall signage. We can’t compress a review queue — but we can start it early if we have approved elevations.

Give us the drawings at design development rather than at 90%, and signage stops being the thing that holds up occupancy.

How we work with contractors

  • One point of contact for every sign on the job — temporary, regulatory, leasing, and permanent — instead of four suppliers and four invoices.
  • We work in your process — submittals, RFIs, schedule updates, and progress meetings.
  • Realistic dates, early. If a permit timeline puts your target date at risk, you hear it at award, not the week before occupancy.
  • Phased and partial installs where site access demands them, including after-hours work.
  • Closeout that’s actually complete — permits, warranties, and a sign schedule the owner can use for years.

Next step

Send us the elevations and the programme. We’ll come back with the sign package, the permit critical path, and the backing and power requirements you need to build in now.

Request a project signage consultation

Related: Monument signs · Building signs · Safety & regulatory signs · Property management · Wayfinding systems

Let's plan your signage program

Discuss your site, priorities, and project requirements.

Request a Consultation